Olympics: Beijing to open three new subway lines by Sunday

Olympics: Beijing to open three new subway lines by Sunday

The new links, built at a total cost of 22.3 billion yuan (3.2 billion U.S. dollars), will increase the number of subway lines in the Chinese capital to eight and the total length of track to 200 kilometers from the current 142 km.

The trains used for the new lines can carry 1,424 passengers each, or 344 more than those on other lines, said Zhou.

The Airport Line links the downtown areas with Terminal 3, a new terminal building at the Beijing Capital International Airport in the northeastern suburbs. Trains will be running at an average interval of 15 minutes, and the 28-km trip takes about 20 minutes, he added.

A public hearing early this month by the National Development and Reform Commission decided a reasonable fare for a subway ride to the airport should be around 25 yuan.

Beijing subway operators have estimated a daily maximum of 30,000 passenger trips on the Airport Line during the Aug. 8-24 Olympic Games, said Liu Jian, deputy head of Beijing Mass Transit Railway Operation Corp. Ltd.

Subway builders have set aside room in the Dongzhimen Railway Station, the downtown end of the Airport Line, where in the future, passengers will be able to check in for their flights and have their luggage delivered, said Zhou.

But no time-table is immediately available as to when the check-in counters will be set up at the downtown subway station.

In another development, a 4.5-km Olympic Branch Line will carry spectators to the main Games' venues in northern Beijing, and Line No. 10 will run 25 km northwest to southeast in the shape of a right angle.

But before and during the Games, this branch line will open exclusively to participants to the Games, including athletes, coaches, journalists and others, and spectators holding tickets of the day, said Zhou.

"The passengers all need to receive security checks on the ground before they take the Olympic subway to the Games' facilities," he said.

Subway operators estimate the Olympic line would be transporting a maximum of 220,000 passengers daily during the Games. Line No. 10, meanwhile, will probably handle 850,000 passenger trips a day in maximum.

A man rides by the destination boards standing outside Beitucheng Subway Station of the 4.5-km Olympic Branch Line in Beijing, capital of China, July 17, 2008. Three new subway lines, including the Airport Line, Olympic Branch Line and Line No. 10 are to be open for trial operation by Sunday to ease traffic and cope with the passenger surge during the Olympic Games.

0 comments: